To swap the poistion of a window and back door to allow for the formation of a new cloakroom. Drainage had to be brought from other side of property to service new toilet and sink. Replace glass in window with satin privacy glass. Re-decorate and lay Karndean floor to match existing. External stone masonary to match. Remove water storage tanks. Change boiler to combi and re-locate to basement area freeing up space in utility. Planning permission sought.
Jim Middleton & Carol Paton (Thursday, 30 July 2009 17:16)
Very pleased with our new loo/utility room. High standards from Vince and the crew in terms of work, ideas, attention to detail and all round commitment to quality. They kept upheavals to a minimum, kept us informed of what was happening and took a proactive approach to problem solving along the way. Wouldn’t hesitate to recommend Finishing Touches to friends and, indeed, already have.
Finishing Touches
Vince & Evelyn James
69 Malbet Park
Edinburgh
EH16 6WB
info@finishingtouches-edinburgh.com
www.finishingtouches-edinburgh.com
Mob: 07711 923 915